The design phase follows, determining capacity requirements and system layout. Subsequently, the site is excavated, and a stable foundation is prepared. The septic tank is then placed and leveled, with secure connections to inlet and outlet pipes. After backfilling and compaction, the drainage system is installed.
Final checks include flow tests and official inspections to ensure compliance. The project concludes with commissioning, where documentation and training are provided, alongside a maintenance and monitoring plan. Throughout the process, adherence to safety and operational guidelines is paramount.
Internal scope includes partitioning for reception/offices, suspended ceilings, plaster and paint, floor finishes, full sanitary installation (WC, urinals, basins, cubicles, tiling), hot/cold plumbing, drainage and stormwater connections, electrical reticulation, LED lighting, power outlets, air‑conditioning units, basic data/communications and fire extinguisher provisions.
External works cover paving, perimeter fencing/gates, signage, rainwater downpipes and minor landscaping. Handover to include commissioning and testing of services, compliance with mine site OHS requirements and as‑built drawings.